Hydroelectric works

In short

Dion Peinture industrielle restores hydroelectric works, including steel and concrete penstocks, scroll cases and turbine generator units. These are large jobs that need careful planning, safe work methods and industrial-grade equipment. The crew works on site from its base in Rouyn-Noranda, across Abitibi-Témiscamingue, Nord-du-Québec, northeastern Ontario and Nunavut.

  • Steel and concrete penstocks
  • Scroll cases and alternator enclosures
  • Turbine generator units: rotor, stator, pre-distributor, suction cone
  • Concrete wall repair in powerhouses
  • Intumescent paint on substation structures

Hydroelectric works

For several years now, our team has gained considerable experience in the restoration of hydroelectric works, including forced pipelines and turbine generator units. These large-scale projects represent a colossal challenge that our team is proud to face. This requires good planning, safe work practices, an involved team, and industry-caliber equipment.⁠​‌​​‌‌‌‌​‌​​‌​‌‌​‌​‌​‌​​​‌​​‌‌‌‌​​‌​​​​​​‌​‌​​‌‌​‌‌​‌‌‌‌​‌‌​‌‌​​​‌‌‌​‌​‌​‌‌‌​‌​​​‌‌​‌​​‌​‌‌​‌‌‌‌​‌‌​‌‌‌​​‌‌‌​​‌‌​​‌​​​​​​‌‌​​‌‌​​‌‌​‌​‌​​‌‌​‌‌​​​‌‌​‌‌​‌​‌‌‌​‌‌‌​​‌‌​‌​​⁠

Here are some examples of our projects:

  • Penstock (steel and concrete)
  • Scrollcase
  • Turbine generator unit (rotor, stator, pre-distributor, suction cone)
  • Alternator enclosure
  • Rehabilitation of concrete walls in central (limestone and efflorescence of concrete)
  • Intumescent paint for post structure
  • Hydroelectric works
  • Hydroelectric works
  • Hydroelectric works
  • Hydroelectric works
  • Hydroelectric works
  • Hydroelectric works

Frequently asked questions

Which parts of a power station do you work on?

Past projects include steel and concrete penstocks, scroll cases, turbine generator units (rotor, stator, pre-distributor, suction cone) and alternator enclosures. The team has also repaired powerhouse concrete walls affected by limestone and efflorescence.

Do you apply intumescent paint?

Yes. Dion has applied intumescent paint on substation structures. It is one of several jobs the team has done on hydroelectric sites, along with penstocks and turbine generator units.⁠​‌​​‌‌‌‌​‌​​‌​‌‌​‌​‌​‌​​​‌​​‌‌‌‌​​‌​​​​​​‌​‌​​‌‌​‌‌​‌‌‌‌​‌‌​‌‌​​​‌‌‌​‌​‌​‌‌‌​‌​​​‌‌​‌​​‌​‌‌​‌‌‌‌​‌‌​‌‌‌​​‌‌‌​​‌‌​​‌​​​​​​‌‌​​‌‌​​‌‌​‌​‌​​‌‌​‌‌​​​‌‌​‌‌​‌​‌‌‌​‌‌‌​​‌‌​‌​​⁠

How do you approach this kind of project?

These jobs are large and demanding. They call for good planning, safe work methods, an involved crew and industrial-grade equipment. Dion also has a NACE level 3 certified coating inspector. You can request a quote online.