Projects

Retention pond sealing for cyanide tank

Membrane sprayed to a thickness of 90 mils dry

SURFACE PREPARATION AND APPLICATION OF POND COATING IN A CONCENTRATOR BUILDING

1. Surface preparation SSPC-SP1,

2. Sandblast surface preparation according to NACE No.6 / SSPC-SP 13.

3. Masking and protections.

4. Application of a single layer without joints of modified polyurethane 2 components SFS = 80-100 mils dry.

Retention pond sealing for cyanide tank

Two components polyurethane

All projects