Projects
Refurbished Painting - Mining scissor lift Work Platform
Refurbished Painting - Mining scissor lift Work Platform
High performance epoxy / urethane system
Surface preparation and application of high performance coating system
1. Surface Preparation SSPC-SP1
2. Sandblast surface preparation according to NACE No.2 / SSPC-SP 6.
3. Masking and protections.
4. Application of one coat of epoxy. DFT = 8 mils.
5. Application of one coat of urethane. DFT = 3 mils.